{"product_id":"2-color-retractable-dual-double-pet-leash-rope-walk-for-dog-long-lead-training-pet-leash-pet-tractor-small-and-medium-dog-cat","title":"Retractable Pet Leash — Configuration Options","description":"\u003cp\u003eA retractable leash with a non-slip handle and thumb-operated lock, pause and release controls.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003eNylon lead material\u003c\/li\u003e\n\u003cli\u003eRotating hook connection\u003c\/li\u003e\n\u003cli\u003eAvailable configuration and color options\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eBefore you order\u003c\/h3\u003e\u003cp\u003eThe supplier lists this family as a double leash, but the blue and red product images appear to show a different configuration from the pink and dark-blue options. The lead count, length and pet weight limits need confirmation for each option. Ask NUVU to verify the exact variant before ordering. This product is not a vehicle restraint.\u003c\/p\u003e\u003cp\u003eShipping and the final total are shown at checkout.\u003c\/p\u003e","brand":"Stevvex","offers":[{"title":"Pink","offer_id":67692466274669,"sku":"41354749-dual-red-france","price":59.0,"currency_code":"USD","in_stock":true},{"title":"Dark blue","offer_id":67692466307437,"sku":"41354749-dual-dark-blue-france","price":59.0,"currency_code":"USD","in_stock":true},{"title":"Blue","offer_id":67692466340205,"sku":"41354749-single-dark-blue-a0-france","price":19.99,"currency_code":"USD","in_stock":true},{"title":"Red","offer_id":67692466372973,"sku":"41354749-single-red-a8-france","price":19.99,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1032\/6291\/2877\/files\/2-color-retractable-dual-double-pet-leash-rope-walk-for-dog-long-629.webp?v=1792091685","url":"https:\/\/shopnuvu.myshopify.com\/products\/2-color-retractable-dual-double-pet-leash-rope-walk-for-dog-long-lead-training-pet-leash-pet-tractor-small-and-medium-dog-cat","provider":"NUVU","version":"1.0","type":"link"}