Retractable Dual Pet Leash — supplier image 4

Retractable Pet Leash — Configuration Options

Pink
$59.00
Skip to product information
Retractable Dual Pet Leash — supplier image 4

Retractable Pet Leash — Configuration Options

$59.00
Color

A retractable leash with a non-slip handle and thumb-operated lock, pause and release controls.

  • Nylon lead material
  • Rotating hook connection
  • Available configuration and color options

Before you order

The supplier lists this family as a double leash, but the blue and red product images appear to show a different configuration from the pink and dark-blue options. The lead count, length and pet weight limits need confirmation for each option. Ask NUVU to verify the exact variant before ordering. This product is not a vehicle restraint.

Shipping and the final total are shown at checkout.

You may also like